The architect and Mann Williams recommended that a Topographic & Measured Buildings Survey should be carried out. This was undertaken by Anthony Brookes Surveys Ltd. It was required to inform the design team about the existing conditions of the building and the land within the boundaries of the church, and to ascertain the positions of the drainage manholes.